Site Preparation
Dimensions and Weights
Thermo Scientific
iCAP RQ Pre-Installation Requirements Guide (P/N BRE0009927, Revision A)
2-7
9. Lift the iCAP RQ ICP-MS instrument on command. Make sure
that all carriers lift off the instrument simultaneously to prevent
uneven load distribution.
10. Rest the back part of the instrument on the bench and slide it into
the desired position.
The rear three of the six support points beneath the iCAP RQ
ICP-MS instrument, see
, consist of synthetic material
that has a low frictional resistance and should easily slide above the
surface of your work bench.
Labeled Components: 1=lifting device (2 ×), 2=transport pallet, 3=front of
iCAP RQ system
Figure 2-5.
Lifting devices attached to instrument (top view)
1
2
3
center of gravity
CAUTION
!
Top Heavy Load.
The mass spectrometer might tip over while being
moved in the laboratory and cause bodily injury or instrument damage.
The instrument’s center of gravity is indicated in Figure 2-5: the
instrument has a tendency to tilt. When lifting the instrument, support
the top of the instrument and keep the tilt angle below 5 degrees; never
exceed 10 degrees.
Содержание iCAP RQ ICP-MS
Страница 1: ...iCAP RQ ICP MS Pre Installation Requirements Guide BRE0009927 Revision A November 2016 ...
Страница 2: ...iCAP RQ ICP MS Pre Installation Requirements Guide BRE0009927 Revision A November 2016 ...
Страница 69: ...I 4 iCAP RQ Pre Installation Requirements Guide P N BRE0009927 Revision A Thermo Scientific Index W W ...
Страница 71: ......