Benchtop pH/ISE Meter Instruction Manual
Calibration and Measurement of pH
14
B. Electrode Connections
1. Attach electrodes with BNC connectors to sensor input by sliding
connector onto input, pushing down and turning clockwise to lock into
position. Connect reference electrodes with pin tip connectors by
pushing connector straight into reference input.
NOTE: If using a combination electrode with a BNC
connector, a reference electrode is not used.
2. Attach the ATC probe to the ATC jack by sliding the connector
straight on until it is firmly in place. The connector has a special
sealing mechanism, which is engaged, when the connector is
properly attached.
Содержание 410Aplus
Страница 3: ...2 Benchtop pH ISE Meter Instruction Manual...
Страница 81: ...80 Benchtop pH ISE Meter Instruction Manual Certificate of Conformity...
Страница 89: ...Benchtop pH ISE Meter Instruction Manual Ordering Information 88...
Страница 101: ...Benchtop pH ISE Meter Instruction Manual Overview of Meter Functions 420Aplus 710Aplus 100...
Страница 115: ...Benchtop pH ISE Meter Instruction Manual Overview of Meter Functions 520Aplus 525Aplus 720Aplus and 920Aplus 114...
Страница 117: ...Benchtop pH ISE Meter Instruction Manual Meter Default 116...
Страница 119: ...Benchtop pH ISE Meter Instruction Manual Multipoint Calibration Curve 118...
Страница 123: ...Benchtop pH ISE Meter Instruction Manual Automatic Blank Correction 122...