![Thelin PARLOUR 3000-MV Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/thelin/parlour-3000-mv/parlour-3000-mv_installation-and-operating-instructions-manual_1101486017.webp)
PARLOUR 3000-MV
DIRECT VENT GAS HEATER
17
Venting Requirements
For proper venting, see Figure 5 and install according
to the following requirements.
WARNING:
The gas appliance and vent system
must be vented directly to the outside of the building
and never be attached to a chimney serving a separate
solid flue or gas burning appliance.
Each direct vent
gas appliance must use its own separate vent
system. Common vent systems are prohibited.
A 4-6 Approved Direct Vent Pipe System is
required for proper installation. An adaptor is
attached to the unit to be used to connect the double
wall system.
N
OTE
:
Venting systems listed below may be used
with the model Echo: Simpson Duravent DV,
Metalbestos DV, Excel DV, Security DV.
Installer
The installer should:
❑
Wear gloves and safety glasses for
protection.
❑
Exercise extreme caution when using
ladders or on roof tops.
❑
Be aware of electrical wiring locations in
walls and ceilings.
PLANNING THE INSTALLATION
There are two basic types of Direct Vent
installations:
▪
Horizontal Termination (Figure 5 and Figure 6)
▪
Vertical Termination (Figure 5 and Figure 6)
When planning your installation, it will be necessary
to select the proper length of vent pipe for your
particular requirements. For horizontal installations,
determine the minimum clearance from the rear of
the appliance to the wall (see the Listing Label). It is
also important to note the wall thickness. Select the
amount of vertical rise desired for “vertical-to-
horizontal” type installations. For vertical
installations, determine the length of vent pipe
required by measuring the distance from the
appliance flue outlet to the ceiling, the ceiling
thickness, the vertical rise in the attic or second story,
and allow for sufficient vent height above the roof
line. For two-story applications, firestops are
required at each floor level. If an offset is needed in
the attic, additional pipe and elbows will be required.
Venting terminals shall not be recessed into a wall or
siding.
Snorkel
For installations requiring a vertical rise on the
exterior of a building, 14” or 36” tall Snorkel
Termination, as shown in Figure 5, are available. If
the Snorkel Termination must be installed below
grade (i.e., basement application), proper drainage
must be provided to prevent water from entering the
Snorkel Termination (see Figure 5).
Do not attempt
to enclose the Snorkel within the wall or any other
type of enclosure.
Vertical Installation
The maximum vertical distance (without restriction)
allowed with this appliance is 12 feet from the top of
the stove to free atmosphere.
Vertical rises in excess
of 12’ may require the closing of the
Содержание PARLOUR 3000-MV
Страница 8: ...PARLOUR 3000 MV DIRECT VENT GAS HEATER 8 LABORATORY LISTING LABEL...
Страница 10: ...PARLOUR 3000 MV DIRECT VENT GAS HEATER 10 FIGURE 1 DIAGRAM OF DIMENSIONS...
Страница 15: ...PARLOUR 3000 MV DIRECT VENT GAS HEATER 15 FIGURE 4 VENT TERMINATION LOCATIONS...
Страница 18: ...PARLOUR 3000 MV DIRECT VENT GAS HEATER 18 FIGURE 5 DIAGRAM OF VENTING REQUIREMENTS...
Страница 23: ...PARLOUR 3000 MV DIRECT VENT GAS HEATER 23 FIGURE 8 DIAGRAM OF CONTROL COMPONENTS...
Страница 33: ...PARLOUR 3000 MV DIRECT VENT GAS HEATER 33 FIGURE 12 GAS VALVE AND PILOT ASSEMBLY...
Страница 34: ...PARLOUR 3000 MV DIRECT VENT GAS HEATER 34 APPENDIX A VERTICAL PIPE INSTALLATION AIR INTAKE RESTRICTOR DISKS...
Страница 35: ...PARLOUR 3000 MV DIRECT VENT GAS HEATER 35 APPENDIX B PARLOUR STOVE WITH BURNER...