Running A Test
49
If there is insufficient memory to save the results, the instrument reports an error. In this case it will be necessary to
go to the memory menu to delete some results or setup and then save the data from there.
Saving the results clears them from the main memory so the results displayed on the screen
are cleared. If you wish to review the results after they have been saved it is necessary to
use the Memory menu and access the location indicated when “
SAVE
” was pressed.
8.8
Printing the Test Results
Pressing “
” causes the system to print out the test results on the internal printer. The header of the report
indicates the current test setup in the same format as the print from the
SETUP
menu
******** TTR TEST REPORT *******
Transformer: DUT Serial No.
Type: DUT Type
Location: DUT Location
Tested By: Operator
Instrument: TETTEX2795
Serial No.: 1234-56-78
Date Of Test : 09/22/04
Time of Test : 08:23:45
Test Voltage : Auto
Max Deviation: 0.5%
Configuration: Auto 3ph
HV Nom Volt : 3.0 kV
LV Nom Volt : 1.0kV
Total Taps : 4
Bottom Tap : -2
Nominal Tap : 0
Step Tap-Tap : 0.05kV
For set of measurements on the transformer the instrument reports the measurements in this format:
Tap -2 (1 of 5)
HV: 5.00kV LV: 1.00kV
Ph T-R Dev(%) P(deg) I(mA)
A 5.0168 0.33 -0.7 48 P
B 5.0168 0.33 -0.8 55 P
C 5.0681 1.36 -0.7 66 F
If the transformer is untapped, then the report only has a single set of measurement results, and no tap identification
information is displayed. If the transformer is tapped, the report shows the tap identification and where it is in the
sequence of taps.
For each phase the report indicates the turns ratio, the deviation of that turns ratio from the nominal, the phase shift
between primary and secondary and the current drawn. On the right hand side of the report it indicates “
P
” if the
Содержание TTR 2795
Страница 1: ...Operating Instructions HAEFELY TEST AG TTR 2795 Transformer Turns Ratio Meter Version 1 4 ...
Страница 10: ...6 Introduction Maximum Roll Diameter Outer 50mm Inner 10mm ...
Страница 22: ...18 Connection and Setup Figure 11 Connecting to three phase BCT ...
Страница 101: ...Application Software APSW 2795 97 ...
Страница 111: ...Miscellaneous 107 14 7 Conformity ...