42
Setting Up Tests
The left-hand column shows the description of the data held a specific memory. If this is a Setup (that is, there are no
results associated with the entry) the text that is displayed is that held in the “
DUT Type
” field. If the If the entry in the
memory is a set of test results, then the text displayed is the information held in the “
DUT Serial No.
” field. If a set
of test results is selected to be loaded, only the information relating to the setup of the test plus the DUT and operator
identification information is copied over. No result information is copied. The second column indicates whether the
data stored is Setup or Test information. The final column indicates the memory location where the information is
stored.
Setup information is loaded by rotating the knob until the required Test or Setup is highlighted. It is loaded by pressing
the “
OK
” button. Pressing “
CANCEL
” returns to the main setup screen.
7.7
Saving a Setup
Once a setup has been defined, it can be saved to memory by pressing the “
SAVE
” button. This displays a number
entry edit box, which is preset to the next available memory. To save the data into this memory press “
OK
”. Otherwise
enter the required number as described in section 4.3. If there is no available memory, the system will report that it
cannot save the data. Once the data has been saved into the memory, the system will display a message box
confirming the operation. Press “
OK
” to return to the Setup menu.
Printing a Setup
To print a setup, press “
” This will print all the information relating to the test onto the built-in printer unit. The
format of the printout is:
******** TTR TEST REPORT *******
Transformer: DUT Serial No.
Type: DUT Type
Location: DUT Location
Tested By: Operator
Instrument: TETTEX2795
Serial No.: 1234-56-78
Date Of Test : 09/22/04
Time of Test : 08:23:45
Test Voltage : Auto
Max Deviation: 0.5%
Configuration: Auto 3ph
HV Nom Volt : 3.0 kV
LV Nom Volt : 1.0kV
Total Taps : 4
Bottom Tap : -2
Nominal Tap : 0
Step Tap-Tap : 0.05kV
Содержание TTR 2795
Страница 1: ...Operating Instructions HAEFELY TEST AG TTR 2795 Transformer Turns Ratio Meter Version 1 4 ...
Страница 10: ...6 Introduction Maximum Roll Diameter Outer 50mm Inner 10mm ...
Страница 22: ...18 Connection and Setup Figure 11 Connecting to three phase BCT ...
Страница 101: ...Application Software APSW 2795 97 ...
Страница 111: ...Miscellaneous 107 14 7 Conformity ...