Connection and Setup
17
4.8
Bushing Current Transformers
Figure 10 : Connecting to Single Phase BCT
It is possible to test bushing current transformers once they are in-situ. This relies on the minimal loading of the test
circuit by the secondary measurement system of the TTR instrument. The primary (or secondary depending on the
configuration) connections of the transformer should also be jumped out to create a shorted turn and minimize the
inductance of the secondary (or primary). Suitable jumper cables will need to be provided by the user.
When testing BCT systems on three phase transformers, the method of setting up the measurement depends on
whether the BCT are mounted on a Y or a Delta connection. The BCT are tested using a three-phase configuration,
though do not use automatic configuration or phase determination. The measurement configuration used depends on
the winding to which the Bushing current transformers connect. If there is an accessible neutral, test the transformer
using YNyn0 otherwise test using Yyn0. The transformers are connected as follows:
Содержание TTR 2795
Страница 1: ...Operating Instructions HAEFELY TEST AG TTR 2795 Transformer Turns Ratio Meter Version 1 4 ...
Страница 10: ...6 Introduction Maximum Roll Diameter Outer 50mm Inner 10mm ...
Страница 22: ...18 Connection and Setup Figure 11 Connecting to three phase BCT ...
Страница 101: ...Application Software APSW 2795 97 ...
Страница 111: ...Miscellaneous 107 14 7 Conformity ...