Section 3: Unpacking and Installation
FC/BCD-2800 Facility and Installation Guide
FC/BCD-2800 F & I Guide
3-6
0101-8603-0, Rev. F
properly made, the Temescal service representative is responsible for energizing the
system or for supervising the customer in doing so.
DANGER
Before operating the equipment, make sure that all service connections
have been properly made. Until you have verified that that is the case,
make certain that all circuit breakers remain OFF.
3.3.4 Pump
Rotation
Check
1. Verify that all service connections to the pump have been properly and securely made.
2. Check all e-beam sources to ensure that water and compressed gases are available
at the proper pressures and flow rates.
3. Measure voltages at all TB1 terminals to verify that the required voltages are being
supplied to the system (see the vacuum cubicle wiring diagram).
4. The correct direction for the pump’s rotation is indicated by an arrow on the pump.
Check its rotation direction by briefly switching on the pump’s circuit breaker. If the
pump is turning the wrong way, interchange any two hot lines at the pump motor.
Switch the pump on again briefly to verify that it is now turning in the proper direction.
3.3.5
System Ready for Startup
System installation should be complete when:
all system components are properly positioned
all required service connections have been made and verified
all necessary adjustments have been made.
The system is then ready for inspection and startup by a Temescal service
representative.
3.4 Installation
Drawings
The following drawings are provided to facilitate system installation.
Figure 3-1 Vacuum Cubicle Height and Width
[2403.9]
94.6