![Temescal BCD-2800 Скачать руководство пользователя страница 2](http://html.mh-extra.com/html/temescal/bcd-2800/bcd-2800_facility-and-installation-manual_1085345002.webp)
Revision History
0101-8603-0
Revision
Change Description
Reason/
Application
Date
Approved
A
First published version of FC-2800 F
& I Guide
Applies to all FC-2800
systems
July
2006
SS
B
Revised sections 1.4, 2.2.1, and
3.2.7. Modified Figures 3-4 through
3-14.
Clarified specifications and
instructions regarding cold
water supplies #2 and #3.
Nov.
2006
SS
C
Throughout manual, deleted
information related to Simba 2 power
supply. In Section 1, expanded Site
Preparation Checklist to include
cable length selections. In Sections 1
and 2, updated current specifications
for CV-16SLX and CV-12SL power
supplies. Added Figs. 3-3 and 3-4,
updated Fig. 3-5, and deleted former
Figs. 3-7 through 3-12.
Phase-out of Simba 2
power supply. Received
updated Engineering info
regarding current specifi-
cations for CV-6SLX and
CV-12 SL power supplies.
Aug.
2009
CK
D
In sections 1.4 and 2.5, corrected
values for power drops to be
provided for vacuum system and e-
beam power supply..
Updated specifications
provided by Temescal Field
Service and Temescal
Engineering.
July
2010
LW
E
Updated Figure 3-2.
Minor corrections to
drawing.
Oct.
2010
LW
F
In sections 1.4 and 2.4, corrected
input power specifications for
vacuum system.
Updated information
provided by Temescal Field
Service.
March
2011
LW
© 2011 Ferrotec (USA) Corporation. All rights reserved.