Section 1: Introduction and Site Prep. Checklist
FC/BCD-2800 Facility and Installation Guide
FC/BCD-2800 F & I Guide
1-4
0101-8603-0, Rev. F
Compressed Gases:
For additional details, see section 2.3.
Vent Gas:
Clean Dry Air (CDA) and/or Nitrogen (N
2
) (recommended)
60 to 120 psig (4.14 to 8.27 bar)
Compressed Air for Pneumatics:
90 to 120 psig (6.21 to 8.27 bar)
Note: Pneumatics air pressure must be at least 10 psi greater
than the maximum hot or cold water pressure.
Helium:
One bottle, 99.999% pure.
Optional Process Gas:
Argon, 99.995% minimum purity
1 to 4 sccm, for FC ion beam source without PBN, or
3 to 7 sccm, for FC ion beam source with PBN
Electrical:
For additional information, see sections 2.4.
Main System (Drop #1)
208 VAC, 50/60 Hz, 3-phase 4-wire, 150 A, or
400 VAC, 50/60 Hz, 3-phase 5-wire wye, 90 A
HV Power Supply (Drop #2)
(Select one power supply only)
208-V CV-6SLX
, 208 VAC, 50/60 Hz, 3-phase delta (4-wire), 30 A
400-V CV-6SLX
, 400 VAC, 50/60 Hz, 3-phase wye (5-wire, with
neutral), 20 A
208-V CV-12SLX,
208 VAC, 50/60 Hz, 3-phase delta (4-wire), 50 A
400-V CV-12SLX,
400 VAC, 50/60 Hz, 3-phase wye (5-wire, with
neutral) 30 A
Ground:
System requires good earth ground, low impedance to RF as well as DC
currents. For illustrations and additional details, see section 2.5.
Site Preparation and Installation Instructions
: Section 3 of this F&I Guide has
been read and understood.
Specification of Cable and Helium Line Lengths
Use this section of the checklist to specify the lengths of the nominal, component-to-
component route of helium lines, power and control/data cables, and 3”-wide copper
ground strap in your installation. Temescal will add length as appropriate for service
loops. Helium lines, power cables, and control/data cables are available in 10-ft.
increments from 10 ft. to 70 ft.
NOTE
Specified cable/helium line lengths should reflect actual routing as
anticipated in your installation, not the shortest distances between the
connection points on the various components. For each cable or line,
enter a length that is the nearest multiple of 10 ft. above the
anticipated cable/line run.