FlexSym
©
OLT-mini Installation and Turnup Guide
Page 25 of 35
•
When the Wizard finishes gathering data, a summary is displayed for
confirmation. To accept the configuration and perform the turnup, type
Y
at the
prompt and press
E
NTER. The turnup configuration will be applied and the OLT
restarted if necessary.
| Element Management Configuration |
|===============================================================================================|
| Bridge Configuration |
| Bridging Type : 802.1q |
| |
| Network Interface(s) |
| Interface ID : NET1 |
| Admin State : enabled |
| |
| Port ID(s) |
| Port #1 : MDS1-ESUA-1 |
| |
| LACP |
| Admin State : disabled |
| Mode : active |
| Timer : long |
| |
| VLANs : ... 2995 ... |
| |
| Port VLAN Defaults |
| Default VLAN ID : 2995 |
| Default VLAN Priority : 0 |
| |
| VLAN Interface(s) |
| VLAN Name : 2995 |
| Bridge Domain : customer |
| Admin State : enabled |
| |
| IP Configuration |
| IP Stack Type : IPv4 |
| |
| IPv4 Configuration |
| IP Address : 192.168.1.201 |
| Network Mask : 255.255.255.0 |
| |
| IP Static Route Configuration |
| Default Gateway : 192.168.1.1 |
| |
| Element Management |
| Admin State : Enabled |
| IP Stack Type : IPv4 |
| VLAN Priority : 7 |
|===============================================================================================|
Apply this Element Management configuration(may trigger a restart): (y/n) ...................[n]: _
If you made a mistake during Turnup, enter
N
at this prompt and the wizard will
terminate without applying the turnup data entered. You can then relaunch the wizard
to correct any mistakes. The next attempt should be faster as the wizard will use the
responses from the last execution as defaults in each prompt.