![Telebyte CFA-24 Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/telebyte/cfa-24/cfa-24_reference-manual_1079741045.webp)
Model CFA-24 Transparent Cable Farm Automation Switch Reference Manual Page 41 of 78
8.0
Making Connections Process
8.1 Steps in Making Connections Process
1.
Rack mounting (optional)
2.
Segment twisted-pair loop segments connected to coordinate punch down blocks.
3.
Connection of CO and CPE-side equipment
4.
Establishing Cable Shield Continuity
5.
Establishing proper grounding
6.
Connecting Segment Extenders
8.2 Rack Mounting (optional)
To allow for dense installations, each unit may be installed in the front and/or back of a standard 19” rack. In addition,
three rack mount options make installation customizable.
➢
Care should be taken to leave space for easy access to the back of the unit. This
area contains an access door that may need to be used at some point.