Test The Outputs 

System Pump (Sys Pmp)

If a system pump is connected to the 

Sys Pmp terminal (5), make

sure that power to the terminal block is off, and install a jumper
between the 

Power L and the Sys Pmp terminals (3 and 5). Install

a second jumper between 

Power N and N terminals (4 and 6). When

power is applied to the 

Power L and Power N terminals (3 and 4),

the system pump should start. If the pump does not turn on, check
the wiring between the terminal block and pump, and refer to any
installation or troubleshooting information supplied with the pump.
If the pump operates properly, disconnect the power and remove
the jumpers.

Variable Speed Injection Pump (

Var Pmp

)

If a variable speed injection pump is connected to the 

Var Pmp terminal (7), make sure that power to the terminal block is off, and

install a jumper between the 

Power L and the Var Pmp terminals (3 and 7). Install a second jumper between Power N and N

terminals (4 and 8). When the variable speed pump circuit is powered up, the variable speed pump should operate at full speed.
If the pump does not operate, check the wiring between the terminal block and the pump, and refer to any installation or
troubleshooting information supplied with the pump. If the pump operates properly, disconnect the power and remove the jumpers.

Boiler

If the boiler circuit is connected to the 

Boiler terminals (9 and 10), make sure power to the boiler circuit is off, and install a jumper

between the terminals. When the boiler circuit is powered up, the boiler should fire. If the boiler does not turn on, refer to any
installation or troubleshooting information supplied with the boiler. (The boiler may have a flow switch that prevents firing until the
boiler loop pump is running). If the boiler operates properly, disconnect the power and remove the jumper.

 Connecting The Control 

Make sure all power to the devices and terminal blocks is off, and remove any
remaining jumpers from the terminals.

Reconnect the terminal blocks to the control by carefully aligning them with their re-
spective headers on the control, and then pushing the terminal blocks into the headers.
The terminal blocks should snap firmly into place.

Install the supplied safety dividers between the unpowered sensor inputs and the pow-
ered 120 V (ac) or 24 V (ac) wiring chambers.

Apply power to the control. The operation of the control on power up is described in the
Sequence of Operation section of this brochure.

11 12

14

13

UnO

Sw

Com Boil Mix

3

5

6

N

Sys

Pmp

L

N

120V (ac)

L

Power

4

N

System
pump

Содержание Mixing Control 361

Страница 1: ...Demand Signal Input tekmar Timer Optional Input Indoor Sensor Optional Output Variable Speed Driven Pump Input Universal Sensor Included Press the Item buttons simultaneously for 1 sec to enter the A...

Страница 2: ...ommend reading Section A General Operation of the Sequence of Operation as this contains important information on the overall operation of the control Then read the sub sections that apply to your ins...

Страница 3: ...s the current status of the control s inputs outputs and operation Item Field Displays an abbreviated name of the selected item Pump Displays when the mixing system pump is in operation Burner Display...

Страница 4: ...An outdoor sensor is not required during this mode of operation VARIABLE SPEED A standard wet rotor circulator is connected to the 361 on the Var Pmp and N terminals 7 and 8 The 361 increases or decr...

Страница 5: ...ction B1 General Section B2 Installer Section B3 Advanced Section B1 General MIXING DEMAND A mixing demand is required in order for the 361 to provide heat A mixing demand is generated by applying a v...

Страница 6: ...ET becomes the setpoint supply temperature that the control is to maintain The MIX TARGET temperature is set by the installer in the ADJUST menu An outdoor sensor is not required during this mode of o...

Страница 7: ...r temperature to the heating element and the room air temperature Default values MIX DSGN 180 F 82 C MIX MAX 200 F 93 C MIX MIN OFF Radiator 5 A radiator terminal unit has a large heated surface that...

Страница 8: ...ating system to satisfy this demand If the control is in setpoint mode the WWSD feature is not functional Section C Boiler Operation Section C1 General Operation Section C2 Boiler Sensor Placement Sec...

Страница 9: ...temperature directly but allows the boiler to operate at its operating aquastat setting when required If this mode of operation is selected the boiler pump should either operate continuously or be op...

Страница 10: ...and select those sections of the chamber with common voltages Do not allow the wiring to cross between sections as the wires will interfere with safety dividers which should be installed at a later t...

Страница 11: ...oiler Contact The Boiler terminals 9 and 10 are an isolated output in the 361 There is no power available on these terminals from the control These terminals are to be used as a switch to either make...

Страница 12: ...rly test the wiring and sensors Test The Sensors In order to test the sensors the actual temperature at each sensor location must be measured A good quality digital thermometer with a surface temperat...

Страница 13: ...any installation or troubleshooting information supplied with the pump If the pump operates properly disconnect the power and remove the jumpers Boiler If the boiler circuit is connected to the Boiler...

Страница 14: ...uick Setup The quick setup can be used for both outdoor reset and setpoint operation To enter the installer programming mode set the Advanced Installer DIP switch to Installer OUTDOOR RESET Access the...

Страница 15: ...Use the or button to set the scale to F or C To exit the ADJUST menu press and release the Item button to advance to the ESC item Then either press the or button or leave the buttons alone for 20 seco...

Страница 16: ...culation for the heating system OUTDR DSGN OFF 70 F to 220 F 21 to 104 C B3 The design indoor air temperature used in the heat loss calculation for the heating system OUTDR DSGN OFF 35 to 100 F 2 to 3...

Страница 17: ...used to rapidly advance through the test sequence To reach the desired step repeatedly press and release the Test button until the appropriate device and segment in the display turn on Step 1 The inj...

Страница 18: ...ng close attentiontothelocationofpumps checkvalves pressurebypassvalves andmixingvalves Ensurecorrect flow direction on all pumps This is also a very useful step if additional assistance is required D...

Страница 19: ...IN adjustment is higher than 100 F 38 C the control operates the Boiler contact as a boiler enable see section C The boiler temperature is then limited by the operating aquastat If the BOIL MIN adjust...

Страница 20: ...tekmar representative for that territory If the address of the repre sentative is not known please request it from tekmar at the telephone number listed below All speci cations are subject to change w...

Отзывы: