ENGLISH
ATA Energy Storage System MM
35
User’s manual
12
Three Phases Connection
12.1
Introduction
It is necessary to connect 3 pcs of identical power and specification ATA in parallel, installing an ATA for each phase:
so the max handling power is 15KVA/12KW (for ATA 5.0 MM).
12.2
Parallel Kit
The parallel kit consists of:
12.3
Parallel Kit Installation
1.
Remove the metal cover, see the following figure.
2.
Remove the Communication Board (with RJ45 and USB port).
Parallel Board
Parallel Cable
Sharing Current Cable
Содержание ATA 4.0 MM
Страница 2: ......
Страница 64: ...ENGLISH User s manual 58 ATA Energy Storage System MM...
Страница 123: ......
Страница 124: ...TECNOWARE s r l www tecnoware com...