ENGLISH
ATA Energy Storage System MM
33
User’s manual
11.11
Startup
1.
Before the Startup of the system:
Check all the connections of the Parallel system.
Be sure that the protection systems on the Input LINE connections are open and Input NEUTRAL connections are
connected in common
.
2.
Place the circuit breaker of batteries in “ON” position.
3.
Place the On/Off switch of each ATA unit in “ON” position.
LCD Display – Master ATA
LCD Display – Slave ATA
ATTENTION: the Master and Slave units are randomly selected.
4.
Place the circuit breakers of PV panels in “ON” position.
5.
Turn ON all the protections of Input Line. We recommended to connect all inverter to the AC Utility Line at the
same time, otherwise the error nr. 82 will be displayed. Anyway the ATA units will restart automatically; so when they
detect the AC Utility Line begin to work normally.
LCD Display – Master ATA
LCD Display – Slave ATA
6.
If no other errors are displayed, the startup procedure of the parallel system is completed.
7.
Finally turn ON the switches of the devices to be powered. The system will power these devices.
Содержание ATA 4.0 MM
Страница 2: ......
Страница 64: ...ENGLISH User s manual 58 ATA Energy Storage System MM...
Страница 123: ......
Страница 124: ...TECNOWARE s r l www tecnoware com...