Page 35 of 52
THIS MANUAL IS THE PROPERTY OF
TECHNOGEL SpA
–
ALL REPRODUCTIONS, EVEN PARTIAL, ARE FORBIDDEN
35
The maintenance technician must make sure the power supply is disconnected before
servicing the electrical parts inside the machine bodywork.
6.2.5
Periodicity of maintenance operations
ACTIVITY
FREQUENCY OF MAINTENANCE
Washing and sanitising
At the end of every work cycle
Before every period of inactivity of the machine
Replacement of O-Ring
gaskets
Annually
Draining of water cooling
system
At the end of every work season
Glycol level check
At least once a year
Every time a leak occurs
Replacement of fuses
When required