Page 30 of 52
THIS MANUAL IS THE PROPERTY OF
TECHNOGEL SpA
–
ALL REPRODUCTIONS, EVEN PARTIAL, ARE FORBIDDEN
30
5.6
START-UP AND COMMISSIONING
Upon commissioning or after transport, we recommend leaving the machine to stabilise to reset the correct
circulation of the oil inside the refrigerator system.
It is essential to have read this manual before start-up and commissioning.
Specifically check the machine is properly installed as described in par. 3.5.
Do not immediately switch-on the machine but leave the heaters to work for at least 30 minutes, after having
powered the machine (green START button on).
Upon commissioning, clean and sanitise the machine before product loading.
The machine must remain in vertical position for at least 24 hours if it has been stored or transported in a
different position to vertical.
Non-compliance with the above can seriously damage the refrigerator system and its components.
ATTENTION
Before starting their work shift, the authorised operators must wear the personal protective
equipment suitable for the operations to be carried out, as stated in paragraph 4.5
"PERSONAL PROTECTIVE EQUIPMENT TO BE USED" in this manual.