187
/
188
d. There are three ways to open the front left storage
box :1. Before removing the battery, press the switch next to
the front right storage box switch to open it .2, Use the
battery to connect the positive and negative terminals of the
vehicle to make the vehicle start up, press the switch next to
the front right storage box switch to open it .3. Find out the
front left storage box switch next to the tap lock or behind
the front left storage box, and pull out the protruding part of
the switch according to the direction of the arrow to the
outside.
e. Remove 2 M6x14 bolts and 1 M6x16 bolt on the front
left storage box with a 4# inner hexagon. Remove the 1 nail
securing the front left storage box with a 4# inner hexagon.
f. Remove the front left storage box to the appropriate
position, unplug the USB connector of the front left storage
box, and remove the front left storage box. Follow the steps
for the right storage box cover to disassemble the left
storage box cover.
Disassembly the front storage box panel
a. Remove the two M6x14 bolts from the front storage box
panel with the 4# inner hexagon.
b. Find out the the 3 connectors on the left side of storage
box panel and unplug them on the next to the tap lock
c. Find out and unplug the PKE bullet connector, PKE
connector, and PKE antenna connector on the right side of
the front storage box panel.
d. Remove the front storage box panel.
e. Flip to the back and pull the cable out of the lock frame
in the direction of the arrow. Turn back to the front and
remove the M6
×
12 bolts with 4# hexagon sockets
respectively, and hold the PKE bracket assembly
①
, the
right storage box lock assembly
②
, and the electronic front
storage box lock assembly
③
on the back.
f. Flip it over to the back and cut 2 cable ties, remove 3
ST4.2×12 self-tapping screws with 5# hexagon socket, and
then remove the front storage box switch from the panel.
Remove the zipper from the switch.
Содержание ZONTES 310T-M 2022
Страница 1: ...1 188 ZT125 310T M Maintenance Manual 2022 09 14 ...
Страница 91: ...91 188 l So far the adjustment operation of the valve clearance is completed ...
Страница 115: ...115 188 Electrical schematic diagram of EFI system ...
Страница 156: ...156 188 Exploded view of front fork components M125 310 Directional exploded view ...
Страница 157: ...157 188 Front fork exploded view The M125 are similar to the M310 taking the M310 as an example ...
Страница 158: ...158 188 Exploded view of lower link board The M125 are similar to the M310 taking the M310 as an example ...
Страница 173: ...173 188 ...