152
/
188
Charging system layout diagram
1-Charging port (PKE) 2-Main fuse (25A) 3-Battery 4-Magnetic motor 5-Rectifier
Electrical schematic diagram
Letter
G
R
Y
Chinese green
Red
yellow
English
Green
Red
Yellow
Battery disassembly
1. Disassembly
Refer to the steps “a” to “d” in the section "Removing the
stepper motor and cleaning the carbon deposit" in the
section "Throttle valve body" in the "Maintenance" chapter
of this manual to remove the battery.
Caution:
●The whole vehicle must be powered
off before
disassembling the battery.
Содержание ZONTES 310T-M 2022
Страница 1: ...1 188 ZT125 310T M Maintenance Manual 2022 09 14 ...
Страница 91: ...91 188 l So far the adjustment operation of the valve clearance is completed ...
Страница 115: ...115 188 Electrical schematic diagram of EFI system ...
Страница 156: ...156 188 Exploded view of front fork components M125 310 Directional exploded view ...
Страница 157: ...157 188 Front fork exploded view The M125 are similar to the M310 taking the M310 as an example ...
Страница 158: ...158 188 Exploded view of lower link board The M125 are similar to the M310 taking the M310 as an example ...
Страница 173: ...173 188 ...