OPERATING PROCEDURES
6-3
Models 345, 346, 349, 355
Operating Procedures
6
Figure 6-6
Note:
The scraper blades on the beater assembly
should be in the 6 o'clock and 12 o'clock positions.
This will enable freezer door installation.
Figure 6-7
7. Install the draw valve. Slide the two O-rings into the
grooves on the draw valve. Lubricate the O-rings and
the valve as illustrated below.
Figure 6-8
Insert the draw valve into the freezer door spout from
the front of the machine. The valve is properly
installed when the hole in the draw valve is visible in
the slot of the freezer door spout.
Figure 6-9
8. Snap the draw valve handle onto the door spout.
Align the hole in the draw valve with the slot in the
draw handle.
Figure 6-10
Slide the pivot pin through the draw handle and into
the draw valve.
Figure 6-11
10189
11125
11126
11127
11128
11133