
T4100 OM rev2
Page 8 of 50
After Launching:
9
Check bilge for water.
9
Check that engine exhaust is pumping water.
9
Verify operation of forward, neutral and reverse before leaving the dock.
To Be Done Prior to Turning Vessel Over to Owner:
9
Clean entire deck, including removing excess bedding compound from around fittings, which
may continue to ooze for a short time after shipment.
9
Check for deck leaks caused by shipping. NOTE: all boats are thoroughly checked prior to
shipment, but fittings can loosen under shipment and handling.
9
Touch up exterior teak finish if applicable.
9
Inspect and tighten engine shifter and throttle controls as needed.
9
Fill water tank(s) and check operation of water system for leaks as well as the hot water if
included.
9
Check head operation, holding tank and macerator pump. Operate bilge pump(s). NOTE: if auto
pump is installed, adjust switch level and ensure the auto switch is not blocked by bilge hoses.
Operate sump pump, shower and drain collection, and on some models sinks.
9
Check operation of all running lights.
9
All fluid levels in engine are to be checked after test run.
9
All gauges should be operational.
9
Operate galley stove and oven (every burner). Adjust regulator if necessary.
9
Adjust lifelines so they are taut.
9
Remove all traces of shipping tape.
9
Operate all winches and lubricate if necessary.
9
Check operation of all thru-hull fittings.
9
Operate all hatches and ensure that no binding occurs.
9
All interior doors, drawers, hatch boards, operated and planed down if necessary after rigging is
tensioned. A certain degree of swelling is to be anticipated. (This is not a warranty issue, part of
commissioning)
9
Check that all interior lights are operational.
9
Check the hoist on all sails and ensure correct halyard lengths as well as freedom of movement of
halyards, etc. Check and adjust operation of reefing system.
Содержание 4100
Страница 11: ......
Страница 12: ......
Страница 13: ...6 0 W L...
Страница 47: ...T4100 OM rev2 Page 43 of 50 Tartan Yachts Commissioning Checklist...