
T4100 OM rev2
Page 2 of 50
INDEX
1.0
INTRODUCTION
2.0
ILLUSTRATIONS AND TABLES
3.0
CONSTRUCTION
3.1
Hull
3.2
Deck
3.3
Hull / Deck Joint
3.4
Rudder & Steering
3.5
Ballast
4.0
RIGGING
4.1 General
Description
4.2
Spars
4.3
Tuning at the Dock
4.4
Tuning While Sailing
5.0
FUELSYSTEM
5.1 Fuel
Tank
5.2 Fueling
5.3 Fuel
Grade
6.0
ENGINE AND TRANSMISSION
6.1
Engine
6.2
Transmission
6.3 Saildrive
6.4 Propellers
6.5
Removal of Propellers
6.6 Installation
of
Propellers
6.7 Exhaust
System
7.0
CONTROLS
7.1 General
7.2
Starting and Operating the Engine
7.3
Engine Shut Down
8. ACCESSORIES
8.1
Installation of Through Hull Fittings
9. ELECTRICAL
9.1
General
9.2
Batteries
9.3
Alternator
9.4
Charging System
10.
ELECTRONICS
10.1
General
10.2
Through Hull Fittings
10.3
Masthead Fittings
10.4
Electronic Equipment
Содержание 4100
Страница 11: ......
Страница 12: ......
Страница 13: ...6 0 W L...
Страница 47: ...T4100 OM rev2 Page 43 of 50 Tartan Yachts Commissioning Checklist...