Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 4
Table Of Contents
Section ..................................................................................................................................... Page
3.4.11 Electrical Connections ..................................................................................... 23
3.5 Commissioning the Boiler .......................................................................................... 23
3.5.1 Safety Plumbing ................................................................................................. 23
3.5.2 Filling and Venting ............................................................................................ 24
4.0 Boiler Operation, Maintenance, and Service ............................................................... 25
4.1 Control Panel Orientation. .......................................................................................... 25
4.2 Items to Check Before Using ...................................................................................... 28
4.3 Boiler Lighting / Starting Process ............................................................................... 28
4.4 Adding Wood to an Already Established Fire ............................................................ 29
4.5 Daily Firing ................................................................................................................. 29
4.6 Shutting Down the Boiler ........................................................................................... 29
4.7 Operation with Thermal Storage System .................................................................... 29
4.8 Creosote ...................................................................................................................... 30
4.9 Adjusting Combustion ................................................................................................ 30
4.10 Cleaning and Maintenance ........................................................................................ 31
4.10.1 Removing Ash ................................................................................................. 31
4.10.2 Cleaning the Induction Fan .............................................................................. 34
4.10.3 Maintaining Door Seals ................................................................................... 36
4.10.4 Cleaning the Primary Air Channels ................................................................. 36
4.10.5 Smoke Pipe Inspection and Cleaning .............................................................. 38
4.10.6 Chimney Fires .................................................................................................. 38
4.10.7 Checking the Barometric Damper ................................................................... 39
4.10.8 Cleaning the Jacket .......................................................................................... 39
4.10.9 Check for Creosote Build-up ........................................................................... 39
4.10.10 Seasonal Shutdown Procedure ....................................................................... 39
4.10.11 Checking the Pressure Relief Valve .............................................................. 39
4.10.12 Checking System Pressure ............................................................................. 39
4.10.13 Heat Storage System Maintenance ................................................................ 39
4.11 Power Outages .................................................................................................... 39
5.0 Troubleshooting .............................................................................................................. 40
5.1 Troubleshooting Guide ............................................................................................... 40
6.0 Data and Drawings ......................................................................................................... 42
6.1 Measurement Data ...................................................................................................... 42
6.2 Positioning Data .......................................................................................................... 43
6.3 Specification Data ....................................................................................................... 44
6.4 Electrical Diagrams ..................................................................................................... 45
6.4.1 Wiring Diagram A (Boiler Circuit Ladder Diagram) ........................................ 45
6.4.3 Circulator and Overheat Aquastat Wiring Connections .................................... 46
7.0 Warranty Information .................................................................................................... 47
7.1
HS-Tarm Bonus Plus Wood Boiler Warranty
....................................................... 47
8.0 Installation Report for Boiler System ........................................................................... 49
Appendix A-Temperature Conversion ............................................................................... 50
Appendix B- Contact Information ...................................................................................... 51
Appendix C– Quick Start Guide ......................................................................................... 52
Содержание Bonus Plus 30
Страница 2: ......
Страница 55: ...Bonus Plus Instructions Tarm Biomass 1 800 782 9927 Version 11 14 Page 55 ...