Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 37
4.10.3 Maintaining Door Seals
Check the loading door and ash door gaskets regularly to insure that they are sealing well and that
there is no unwanted air leakage into the boiler. Poor seals can result in air leakage into the boiler and
lead to inefficient burning of the boiler or the escape of smoke and gasses from the boiler.
Check the seal for alignment on the door frame by examining the imprint made by the frame on the
seal.
Steps to Replace the Door Seals:
1. Remove the two door hinge bolts that and take off the door.
2. Remove the old sealing with a screwdriver or a chisel.
3. Clean the sealing groove.
4. Press new sealing into the groove. When half the sealing has been inserted, adjust the end and
press in the rest.
5. Secure the sealing by gently tapping with a hammer.
6. Replace the door.
7. Close the door and check its seal.
4.10.4 Cleaning the Primary and Secondary Air Channels
The primary air channels (on both sides of the boiler) can occasionally become blocked reducing the
primary air flow to the firebox.
Checking the Primary Air Openings:
1. Open the firebox door.
2. Lift and remove the firebox aprons
(Fig.4.10).
3. Check the primary air ventilation holes
(Fig.4.11)
for unobstructed airflow.
4. If necessary, clean the openings and air channels.
Boiler Operation, Maintenance, and Service > Cleaning and Maintenance
Fig. 4.10
Fig. 4.11
Firebox Aprons
Primary Air Ventilation Holes
Содержание Bonus Plus 30
Страница 2: ......
Страница 55: ...Bonus Plus Instructions Tarm Biomass 1 800 782 9927 Version 11 14 Page 55 ...