Bonus Plus Instructions Tarm Biomass 1-800-782-9927 Version 11/14 Page 13
2.4 Building Requirements
The boiler must be connected to a tile-lined masonry
chimney
or to a factory-built Type UL
103 HT approved chimney in good condition. See the details in
Section 3.2
A dedicated supply of
fresh combustion
air provided near the boiler is recommended for effi-
cient, safe operation. This supply must not be directly connected to the boiler.
Installation on a non-combustible floor only.
A dedicated 120 VAC
power supply is required (See Section 3.4.9).
Revision of
existing heating system
piping may be appropriate to properly utilize the equip-
ment. Although Tarm Biomass can provide advice and design detail on the integration of this
boiler with the heating system of the building, the ultimate responsibility for the performance
of the system rests with the installer.
Please observe the guidelines and the various
national and local regulations.
Bonus Plus
boilers are designed and approved as heaters for hot water systems with permissi-
ble outflow temperatures of up to 203 ºF (95 ºC).
2.5 Owner Responsibilities
Successful operation of this boiler will require daily involvement by the owner/system operator.
Biomass boilers operate differently from fossil fuel boilers, requiring more oversight and a diligent
cleaning regimen.
The owner/system operator is responsible for correct operation of the boiler per guidelines in
Sections 4.0 and 5.0 of this manual.
Incorrect operation can reduce the boiler life.
Product Description and Requirements for Safe Operation > Building Requirements
WARNING
Risk of Fire!
Do not operate with flue draft exceeding –.10 (-2.54mm) water column.
Do not operate with fuel loading or ash removal doors open.
Do not store fuel or other combustible material within marked installation clear-
ances.
Inspect and clean flues and chimney regularly.
Do not use chemicals to start unit firing.
CAUTION
Hot Surfaces!
Keep children away.
Do not touch during operation.
Maximum draft marked on nameplate.
☼
DANGER
Risk of Fire or Explosion!
Do not burn garbage, gasoline, gasoline type lantern fuel, kerosene, charcoal lighter fluid,
drain oil, or other flammable liquids to start or “freshen up” a fire in the boiler.
Содержание Bonus Plus 30
Страница 2: ......
Страница 55: ...Bonus Plus Instructions Tarm Biomass 1 800 782 9927 Version 11 14 Page 55 ...