Installing the TGA 2050
2–26
TA I
NSTRUMENTS
TGA 2050
9. Locate the tare hang-down wire in your
accessory kit.
10. Hold the wire in your hand so that the
doubly bent top hook is pointing to the left
and the bottom hook is pointing to the right.
11. Using brass tweezers, insert the tare hang-
down wire into the balance chamber on the
tare side and down through the hole above
the tare tube connection, taking care not to
bend the wire.
12. Being careful to keep the top hook pointing
to the left, pass the double bend through the
hang-down loop so the wire is hanging from
the loop.
13. Select the sample pan you will use in your
experiments and load one of the same size
and type onto the tare hang-down wire.
14. Replace the tare tube and finger-tighten it to
compress the O-ring seal.
You are now ready to align the hang-down
wires.
Содержание TGA 2050
Страница 14: ...Introducing the TGA 2050 1 2 TA INSTRUMENTS TGA 2050 ...
Страница 26: ...Introducing the TGA 2050 1 14 TA INSTRUMENTS TGA 2050 ...
Страница 28: ...Installing the TGA 2050 TA INSTRUMENTS TGA 2050 2 2 Starting the 2050 2 32 Shutting Down the Instrument 2 33 ...
Страница 51: ...TA INSTRUMENTS TGA 2050 2 25 Figure 2 15 Installing the Tare Hang Down Wire Installing the Hang Down Wires ...
Страница 60: ...Installing the TGA 2050 2 34 TA INSTRUMENTS TGA 2050 ...
Страница 73: ...TA INSTRUMENTS TGA 2050 3 13 Figure 3 5 Furnace in Fully Closed Position Running an Experiment ...
Страница 86: ...Technical Reference TA INSTRUMENTS TGA 2050 4 2 ...
Страница 104: ...Technical Reference TA INSTRUMENTS TGA 2050 4 20 ...
Страница 106: ...TA INSTRUMENTS TGA 2050 Maintenance Diagnostics 5 2 ...
Страница 130: ...Index TA INSTRUMENTS TGA 2050 I 6 ...