TA I
NSTRUMENTS
TGA 2050
2–19
FUSE
FUSE
Cooling Gas Line
1. Locate the COOLING GAS fitting, a 1/4-
inch compression fitting on the left side of
the TGA cabinet back, marked with a 120
psig maximum warning label (Figure 2.10).
Figure 2.10
TGA COOLING
GAS Fitting
2. Make sure your compressed lab air source is
regulated to between 25 and 120 psig and is
free of oil and water vapors.
3. Connect a compressed lab air line to the
COOLING GAS fitting.
Nitrogen may also be used as a cooling gas.
Installing the Instrument
Cooling Gas Fitting
NOTE:
10 A
Содержание TGA 2050
Страница 14: ...Introducing the TGA 2050 1 2 TA INSTRUMENTS TGA 2050 ...
Страница 26: ...Introducing the TGA 2050 1 14 TA INSTRUMENTS TGA 2050 ...
Страница 28: ...Installing the TGA 2050 TA INSTRUMENTS TGA 2050 2 2 Starting the 2050 2 32 Shutting Down the Instrument 2 33 ...
Страница 51: ...TA INSTRUMENTS TGA 2050 2 25 Figure 2 15 Installing the Tare Hang Down Wire Installing the Hang Down Wires ...
Страница 60: ...Installing the TGA 2050 2 34 TA INSTRUMENTS TGA 2050 ...
Страница 73: ...TA INSTRUMENTS TGA 2050 3 13 Figure 3 5 Furnace in Fully Closed Position Running an Experiment ...
Страница 86: ...Technical Reference TA INSTRUMENTS TGA 2050 4 2 ...
Страница 104: ...Technical Reference TA INSTRUMENTS TGA 2050 4 20 ...
Страница 106: ...TA INSTRUMENTS TGA 2050 Maintenance Diagnostics 5 2 ...
Страница 130: ...Index TA INSTRUMENTS TGA 2050 I 6 ...