TA I
NSTRUMENTS
TGA 2050
2–7
Installing the
Instrument
Before shipment, the TGA 2050 instrument is
inspected both electrically and mechanically so
that it is ready for operation upon proper instal-
lation. Installation involves the following
procedures, described in this chapter:
•
Unpacking the instrument and its
components and accessory kit
•
Inspecting the system for shipping
damage and missing parts
•
Filling the heat exchanger
•
Connecting the TGA to the TA
Instruments controller
•
Connecting the heat exchanger cable and
water lines, purge gas lines, accessories,
and power cable
•
Unpacking the balance
•
Installing the hang-down wires
•
Leveling the instrument and aligning the
hang-down wires
•
Adjusting the sample platform.
If you wish to have your TGA installed by a TA
Instruments Service Representative, call for an
installation appointment when you receive your
instrument.
To avoid mistakes, read this entire chapter
before you begin installation.
Installing the Instrument
t
t
t
t
t
CAUTION:
Содержание TGA 2050
Страница 14: ...Introducing the TGA 2050 1 2 TA INSTRUMENTS TGA 2050 ...
Страница 26: ...Introducing the TGA 2050 1 14 TA INSTRUMENTS TGA 2050 ...
Страница 28: ...Installing the TGA 2050 TA INSTRUMENTS TGA 2050 2 2 Starting the 2050 2 32 Shutting Down the Instrument 2 33 ...
Страница 51: ...TA INSTRUMENTS TGA 2050 2 25 Figure 2 15 Installing the Tare Hang Down Wire Installing the Hang Down Wires ...
Страница 60: ...Installing the TGA 2050 2 34 TA INSTRUMENTS TGA 2050 ...
Страница 73: ...TA INSTRUMENTS TGA 2050 3 13 Figure 3 5 Furnace in Fully Closed Position Running an Experiment ...
Страница 86: ...Technical Reference TA INSTRUMENTS TGA 2050 4 2 ...
Страница 104: ...Technical Reference TA INSTRUMENTS TGA 2050 4 20 ...
Страница 106: ...TA INSTRUMENTS TGA 2050 Maintenance Diagnostics 5 2 ...
Страница 130: ...Index TA INSTRUMENTS TGA 2050 I 6 ...