TA I
NSTRUMENTS
TGA 2050
2–23
Installing the Hang-Down Wires
Installing the
Hang-Down Wires
During installation, take care not to bend the
hang
-
down wires or damage the hang
-
down loops.
1. Turn on the TGA instrument (see Chapter 3
for proper start-up order).
2. Press the
FURNACE
key to lower the
furnace.
3. Locate the sample hang-down wire in your
TGA Accessory Kit.
4. Hold the wire in your hand so that the
doubly bent top hook is pointing to the left
and the bottom hook is pointing to the right.
5. Carefully insert the bottom of the hang-
down wire into the top of the furnace far
enough so that you can insert the top of the
wire into the hang-down tube without
bending the wire (Figure 2.14 on the next
page).
t
CAUTION:
Содержание TGA 2050
Страница 14: ...Introducing the TGA 2050 1 2 TA INSTRUMENTS TGA 2050 ...
Страница 26: ...Introducing the TGA 2050 1 14 TA INSTRUMENTS TGA 2050 ...
Страница 28: ...Installing the TGA 2050 TA INSTRUMENTS TGA 2050 2 2 Starting the 2050 2 32 Shutting Down the Instrument 2 33 ...
Страница 51: ...TA INSTRUMENTS TGA 2050 2 25 Figure 2 15 Installing the Tare Hang Down Wire Installing the Hang Down Wires ...
Страница 60: ...Installing the TGA 2050 2 34 TA INSTRUMENTS TGA 2050 ...
Страница 73: ...TA INSTRUMENTS TGA 2050 3 13 Figure 3 5 Furnace in Fully Closed Position Running an Experiment ...
Страница 86: ...Technical Reference TA INSTRUMENTS TGA 2050 4 2 ...
Страница 104: ...Technical Reference TA INSTRUMENTS TGA 2050 4 20 ...
Страница 106: ...TA INSTRUMENTS TGA 2050 Maintenance Diagnostics 5 2 ...
Страница 130: ...Index TA INSTRUMENTS TGA 2050 I 6 ...