TA I
NSTRUMENTS
TGA 2050
IV
Table of Contents
(continued)
Inspecting the System.......................... 2-8
Choosing a Location ........................... 2-9
Filling the Heat Exchanger................ 2-10
Connecting Cables and Lines............ 2-12
Heat Exchanger Cable
and Water Lines .......................... 2-12
GPIB Cable ................................. 2-14
Purge Lines ................................. 2-17
Cooling Gas Line ........................ 2-19
Power Cable ................................ 2-20
Unpacking the Balance ............................ 2-21
Installing the Hang-Down Wires....... 2-23
Aligning the Sample
Hang-Down Wire .............................. 2-27
Adjusting the Sample Platform ......... 2-31
Starting the 2050....................................... 2-32
Shutting Down the Instrument.................. 2-33
CHAPTER 3: Running
Experiments
............................................... 3-1
Overview .................................................... 3-3
Before You Begin ............................... 3-4
Calibrating the TGA ................................... 3-5
Содержание TGA 2050
Страница 14: ...Introducing the TGA 2050 1 2 TA INSTRUMENTS TGA 2050 ...
Страница 26: ...Introducing the TGA 2050 1 14 TA INSTRUMENTS TGA 2050 ...
Страница 28: ...Installing the TGA 2050 TA INSTRUMENTS TGA 2050 2 2 Starting the 2050 2 32 Shutting Down the Instrument 2 33 ...
Страница 51: ...TA INSTRUMENTS TGA 2050 2 25 Figure 2 15 Installing the Tare Hang Down Wire Installing the Hang Down Wires ...
Страница 60: ...Installing the TGA 2050 2 34 TA INSTRUMENTS TGA 2050 ...
Страница 73: ...TA INSTRUMENTS TGA 2050 3 13 Figure 3 5 Furnace in Fully Closed Position Running an Experiment ...
Страница 86: ...Technical Reference TA INSTRUMENTS TGA 2050 4 2 ...
Страница 104: ...Technical Reference TA INSTRUMENTS TGA 2050 4 20 ...
Страница 106: ...TA INSTRUMENTS TGA 2050 Maintenance Diagnostics 5 2 ...
Страница 130: ...Index TA INSTRUMENTS TGA 2050 I 6 ...