Installing the TGA 2050
2–24
TA I
NSTRUMENTS
TGA 2050
Figure 2.14
Installing the Sample
Hang-Down Wire
6. Thread the hang-down wire up through the
hang-down tube into the balance chamber,
and hook the top of the wire over the top of
the tube (see Figure 2.15 on the next page).
To make the hang-down loops easier to see, we
suggest sliding a piece of white paper into the
balance chamber behind each loop before you hook
the hang-down wire into it. (Do not forget to
remove the paper when finished.)
7. Grasp the top hook of the hang-down wire
with brass tweezers. Being careful to keep
the top hook pointing to the left, pass the
double bend through the hang-down loop so
the wire is hanging from the loop.
8. Unscrew and remove the tare tube.
Hang-Down
Tube
NOTE:
Содержание TGA 2050
Страница 14: ...Introducing the TGA 2050 1 2 TA INSTRUMENTS TGA 2050 ...
Страница 26: ...Introducing the TGA 2050 1 14 TA INSTRUMENTS TGA 2050 ...
Страница 28: ...Installing the TGA 2050 TA INSTRUMENTS TGA 2050 2 2 Starting the 2050 2 32 Shutting Down the Instrument 2 33 ...
Страница 51: ...TA INSTRUMENTS TGA 2050 2 25 Figure 2 15 Installing the Tare Hang Down Wire Installing the Hang Down Wires ...
Страница 60: ...Installing the TGA 2050 2 34 TA INSTRUMENTS TGA 2050 ...
Страница 73: ...TA INSTRUMENTS TGA 2050 3 13 Figure 3 5 Furnace in Fully Closed Position Running an Experiment ...
Страница 86: ...Technical Reference TA INSTRUMENTS TGA 2050 4 2 ...
Страница 104: ...Technical Reference TA INSTRUMENTS TGA 2050 4 20 ...
Страница 106: ...TA INSTRUMENTS TGA 2050 Maintenance Diagnostics 5 2 ...
Страница 130: ...Index TA INSTRUMENTS TGA 2050 I 6 ...