FAAST 7100X
INSTALLATION AND MAINTENANCE INSTRUCTIONS
© Pertronic Industries Ltd
27
FAAST XS (7100X) Installation Guide Iss 1.0, 201606
Section H : FAAST 7100X System Validation Form:
Name
Contact Information
Date
Installer:
Commissioning Agent:
Client Representative:
Witness:
Required Documents
Commissioning Form for Each System (this document):
Yes / No
FAAST System Pipe Layout Report
Yes / No
FAAST System Bill of Materials Report
Yes / No
As-Built Installation Drawings:
Yes / No
Smoke Test Results (optional):
Yes / No
Locally Required Forms
Yes / No
Wiring Checked:
Yes / No
Detector Settings Checked:
Yes / No
Relays Tested:
Yes / No
Device Information:
Fan Speed:
Flow Velocity Chamber:
m/s
Flow Velocity Inlet:
m/s
Fan Speed RPM:
Flow Base Chamber:
m/s
Flow Base Inlet:
m/s
General:
Model Number:
7100X
Serial Number:
Identification Number (Loop Address)
Contact Person:
Customer Name:
Facility Name:
Facility Location:
Device Location:
Site Address:
Daylight Saving:
Starts On
Last Sunday September 02:00
Ends On
First Sunday April 03:00
Time Format
12 Hour
24 Hour
Time Saved:
60 min
Trend Log
Frequency:
Mins / Hrs
Sensor:
Night Mode:
Start Time:
End Time:
Alarm/Fault Relay Latching:
Minor
Latch / Non-Latch
Fire 1
Latch / Non-Latch
Alert
Latch / Non-Latch
Fire 2
Latch / Non-Latch
Air Handling Units:
Yes / No
In-Cabinet Sampling:
Yes / No
Duct Sampling:
Yes / No
Number of Sample Points:
Number of Capillary Points:
Conditions:
Temperature:
Humidity:
Other:
Power Supply Installed correctly?
Yes / No
Pipe Network Installed in Accordance with the PipeIQ design (per Pipe Layout Report)?
Yes / No
Pipe Network Labelled correctly?
Yes / No
Describe Any Variations?
Threshold
Levels:
Day Night
Weekend
Acclimate
Delay (sec)
Min Max
Alert:
Fire 1:
Fire 2: