12
Contents
Starting the migration ...................................................................... 121
Specifying the target systems .......................................................... 121
Completing the migration process .................................................. 121
(Optional) Creating an ID for the VCS One 5.0 Policy Master
cluster and specifying the virtual IP addresses ............................ 122
Verifying that the VCS One 5.0 Policy Master service group
is online ....................................................................................... 122
Creating an ID for the 5.0 Policy Master cluster and
specifying the virtual IP address ............................................. 122
Verify that the ID and virtual IP addresses were updated
successfully ................................................................................. 123
Upgrading the client ......................................................................................... 124
Backing up your 2.0.1 configurations ..................................................... 124
Uninstalling the 2.0.1 client on one system .......................................... 124
Installing and configuring the 5.0 client ............................................... 125
Upgrading the 2.0.1 client to 5.0 on additional systems ..................... 125
Chapter 11
Uninstalling VCS One software
Uninstalling the VCS One software ................................................................ 128
Uninstalling high availability agent software ...................................... 128
Uninstalling Policy Master server software .......................................... 128
Uninstalling the VCS One client software ............................................. 130
Launching the installer ..................................................................... 130
Specifying the system to uninstall .................................................. 130
Deciding about evacuating service groups .................................... 131
Removing residual directories ......................................................... 131
Removing directories from a local zone on Solaris ...................... 131
Uninstalling the Simulator .............................................................................. 132
Appendix A
Reinstalling the Policy Master
Reattaching existing clients to the Policy Master ........................................ 134
Appendix B
Sample Policy Master upgrade scenarios
Upgrade scenario overview .............................................................................. 136
Upgrade scenario details .................................................................................. 137
Performing a simplified upgrade and importing two new systems ... 137
Installing the VCS One 5.0 Policy Master on two new systems .. 137
Migrating configuration and database data to a new system ..... 138
Performing a simplified upgrade without importing systems ........... 139
Deleting a VCS One 2.0.1 system and upgrading it to 5.0 ........... 140
Migrating configuration and database data to a new system ..... 140
Содержание Veritas Cluster Server One
Страница 1: ...Veritas Cluster Server One Installation Guide AIX HP UX Linux Solaris 5 0...
Страница 3: ...Symantec Corporation 350 Ellis Street Mountain View CA 94043 http www symantec com...
Страница 16: ...16 Contents...
Страница 34: ...34 Getting ready to install VCS One Configuring ssh rsh or remsh before installing...
Страница 82: ...82 Installing the Simulator Installing the Simulator...
Страница 106: ...106 Adding shared storage and testing disks for SCSI 3 compliance About VCS One client I O fencing...
Страница 126: ...126 Upgrading from VCS One 2 0 1 to 5 0 Upgrading the client...
Страница 148: ...148 Sample Policy Master upgrade scenarios Upgrade scenario details...
Страница 194: ...194 Sample installation output Installing the VCS One client...
Страница 210: ...210 Index...