
152 VL1500K5 (’05-MODEL)
PAIR (AIR SUPPLY) SYSTEM HOSE ROUTING
1
PAIR control solenoid valve with PAIR reed valve
*1
Connect the air hose to the air
cleaner box.
2
Cushion seat (Apply an adhesive agent to the cushion seat.)
*2 Matching mark (Yellow)
3
Wiring harness
*3 Matching mark (White)
*1
*2
*3
20 – 40 mm
(0.79 – 1.57 in) 20 – 40 mm
(0.79 – 1.57 in)
15 – 20 mm
(0.59 – 0.79 in)
15 – 20 mm
(0.59 – 0.79 in)
SA
MP
LE
Содержание 2005 VL1500K5
Страница 1: ...VL1500 USE THIS MANUAL WITH VL1500 SERVICE MANUAL 99500 39166 01E...
Страница 156: ...VL1500K5 05 MODEL 155 FRAME HEAD COVER INSTALLATION 1 Cushion seat 3 3 mm 0 12 in 2 Apply an adhesive agent SAMPLE...
Страница 180: ...Prepared by May 2004 Part No 99501 39550 01E Printed in Japan 176 SAMPLE...
Страница 181: ...Printed in Japan K5...