50 VL1500K5 (’05-MODEL)
Is the voltage OK?
8) After repairing the trouble, clear the DTC using SDS tool.
(
!
Page 42)
Step 2
1) Connect the IAP sensor coupler.
2) Insert the needle pointed probes to the lead wire coupler.
3) Start the engine at idle speed and measure the IAP sensor
output voltage at the wire side coupler.
(Front cylinder side: between G/B and B/Br wires)
(Rear cylinder side: between G/W and B/Br wires)
"
IAP sensor output voltage: Approx. 2.53 V at idle speed
(Front cylinder side:
+
G/B –
-
B/Br)
(Rear cylinder side:
+
G/W –
-
B/Br)
#
09900-25008: Multi-circuit tester set
09900-25009: Needle pointed probe set
*
Tester knob indication: Voltage (
+
)
Is the voltage OK?
4) After repairing the trouble, clear the DTC using SDS tool.
(
!
Page 42)
YES
Go to Step 2.
NO
• Loose or poor contacts on the ECM coupler
(terminal
6
or
D
).
• Open or short circuit in the Red wire or B/Br
wire.
YES
Go to Step 3.
NO
• Check the vacuum hose for crack or damage.
• Open or short circuit in the G/B wire.
(Front cylinder side)
• Open or short circuit in the G/W wire.
(Rear cylinder side)
• If vacuum hose and wire are OK, replace the
IAP sensor with a new one.
2
V
SA
MP
LE
Содержание 2005 VL1500K5
Страница 1: ...VL1500 USE THIS MANUAL WITH VL1500 SERVICE MANUAL 99500 39166 01E...
Страница 156: ...VL1500K5 05 MODEL 155 FRAME HEAD COVER INSTALLATION 1 Cushion seat 3 3 mm 0 12 in 2 Apply an adhesive agent SAMPLE...
Страница 180: ...Prepared by May 2004 Part No 99501 39550 01E Printed in Japan 176 SAMPLE...
Страница 181: ...Printed in Japan K5...