Chapter 6: Advanced Chassis Setup
6-13
Figure 6-13: Installing the Lower Power Distributor Board
Figure 6-14: Installing the Upper Power Distributor Board
7. Install the replacement lower power distributor board into the same position
on the fl oor of the serverboard node, aligning the mounting holes of the board
with those in the node.
8. Secure the lower power distributor board with the two screws previously set
aside. Do not exceed eight pounds of torque when tightening the screws.
9. Put the support bracket back into place in the node and secure it with the
screw previously set aside.
10. Secure the upper power distributor board to the support bracket using the
four screws previously set aside. Do not exceed eight pounds of torque when
tightening the screws.
11. Replace the air shroud and return the node to its bay in the chassis.
12. Reattach the power cord to the back of the power supply and power up the
node.
1
7
1
10
Содержание FatTwin F628G3-FT+
Страница 1: ...FatTwin F628G3 FT F628G3 FTPT USER S MANUAL Revision 1 0...
Страница 5: ...v FatTwin F628G3 FT FTPT User s Manual Notes...
Страница 10: ...x Notes FatTwin F628G3 FT FTPT User s Manual...
Страница 20: ...1 10 FatTwin F628G3 FT FTPT User s Manual Notes...
Страница 30: ...2 10 FatTwin F628G3 FT FTPT User s Manual Notes...
Страница 34: ...FatTwin F628G3 FT FTPT User s Manual 3 4 Notes...
Страница 156: ...7 50 FatTwin F628G3 FT FTPT User s Manual Notes...