Installation
900414-00 12/2015
Innovative Hearth Products
MHD 35/40 Series Direct-Vent Gas Fireplaces
43
1.
Open the control compartment door
(
Page 52
)
.
2.
Hold the barrier in front of the glass door and slide it up into the slots above the glass door and under the hood.
3.
Slide the barrier bottom down into the slots below the glass door, securing it in place.
22.
Install the Finishing Materials
1.
Complete finished interior wall.
NOTE:
To install the fireplace facing flush with the finished wall, position framework to accommodate the thickness
of the finished wall.
Figure 41 - Combustible Wall Framing
Top Of
Appliance
3”
(77 mm)
This Area
Must Remain
Clear of
Combustible
Materials
1” Min.
(26 mm)
4” Clearance
Minimum
Hood
Standoff
Provides
Space From
Combustible
Materials
Stand Off
Must Be Bent
To Vertical
Position
Combustible
Finished Wall
Materials
NOTE:
See
Cold Climate Insulation on
Page 10
and
Vent Termination Clearances on
Page 24
.
23.
Attach the Safety-in-Operation Warning Labels
1.
Attach the furnished safety instruction labels at all fireplace operation and control points
(
Page 44
).
NOTE:
The installer MUST ensure these warnings are properly attached during installation. The warning labels are a
critical means of informing consumers of safe operation practices.
24.
Installing Batteries in Remote Receiver and Wall Switch
1.
Locate the battery backup and place four (4)
AA
batteries in the remote control.
2.
Locate the wall switch and secure four (4)
AA
batteries in the wall switch battery holder.
NOTE:
Replace batteries as a part of standard maintenance
(
Page 59
)
and as needed when troubleshooting
(
Page 67
).