FORM NO. 660769 REV. C
PAGE 31
2-O
Roller Assembly Installation
Steps:
1. Apply anti-seize to all bolt threads before installing nuts.
2. Insert starboard end of
Roller
over pin on starboard
Fin Plate
.
3. Attach opposite end of
Roller
to
Upper Arm
with nuts and bolts through
Fin Plate
on the port side.
4. Properly torque nuts on port
Fin Plate
.
Nut SS, Nylok
3/8-16
2 Places
Bolt SS, 3/8-
16 x 3”
2 Places
2.
3.
* Hydraulic hoses not shown.
Содержание SWIFTSHIELD A Series
Страница 5: ...FORM NO 660769 REV C PAGE 5 SwiftShield Overview Continued Lines shown disconnected...
Страница 8: ...FORM NO 660769 REV C PAGE 8 1 B Remove The contents of the Power Pack box Pump RC Unit Battery...
Страница 12: ...FORM NO 660769 REV C PAGE 12 1 F Drill Manifold Mounting Holes Location Of Mounting Holes...
Страница 13: ...FORM NO 660769 REV C PAGE 13 1 G Mounting the Pump Note Mount pump using the holes on the left...