FORM NO. 660769 REV. C
PAGE 23
Upper Arm
Steps:
1. Insert
Upper Arm
into
Lower Arm
, on dock side first.
2. Apply anti-seize to bolt threads before installing nut.
3. Temporarily bolt in place with 3/8-
16 x 3” bolt and nut. Continue to step
2-I
4. Repeat on opposite side of
SwiftShield™
after completing step
2-I
.
2-G
Upper Arm Installation
Cross Beam
mounting holes
Temporarily
bolt in place
Lower Arm
Содержание SWIFTSHIELD A Series
Страница 5: ...FORM NO 660769 REV C PAGE 5 SwiftShield Overview Continued Lines shown disconnected...
Страница 8: ...FORM NO 660769 REV C PAGE 8 1 B Remove The contents of the Power Pack box Pump RC Unit Battery...
Страница 12: ...FORM NO 660769 REV C PAGE 12 1 F Drill Manifold Mounting Holes Location Of Mounting Holes...
Страница 13: ...FORM NO 660769 REV C PAGE 13 1 G Mounting the Pump Note Mount pump using the holes on the left...