FORM NO. 660769 REV. C
PAGE 29
2-M
Cross Beam Installation
Steps:
1. Apply anti-seize to all bolt threads before installing nuts.
2. Temporarily attach both ends of
Cross Beam
with nuts and bolts to arms.
3. Properly torque nuts on
Cross Beam
.
4. Check level of hydraulic fluid reservoir in control box.
Actuate lift to the down position, with the
SunShield
in the uncovered position.
Hydraulic fluid level should be within 1” of top. Add
SunFluid
as necessary.
* Hydraulic hoses not shown.
Bolt SS,
3/8-
16 x 3”
4 Places
Nut SS, Nylok
3/8-16
4 Places
Starboard Fin
Plate with Pin
Содержание SWIFTSHIELD A Series
Страница 5: ...FORM NO 660769 REV C PAGE 5 SwiftShield Overview Continued Lines shown disconnected...
Страница 8: ...FORM NO 660769 REV C PAGE 8 1 B Remove The contents of the Power Pack box Pump RC Unit Battery...
Страница 12: ...FORM NO 660769 REV C PAGE 12 1 F Drill Manifold Mounting Holes Location Of Mounting Holes...
Страница 13: ...FORM NO 660769 REV C PAGE 13 1 G Mounting the Pump Note Mount pump using the holes on the left...