FORM NO. 660769 REV. C
PAGE 21
2-E
Finding Midpoint of Boat
Pinning the Cylinder Mount Tube
Steps:
1. Using a tape measure, determine overall length of the boat, including swim plat-
form, if equipped.
2. Locate the midpoint between the bow and stern of the boat.
3. With the boat in the standard position on the
SunLift
™
in the full upright position,
adjust
Cylinder Mount Tube
so that forward lug hole aligns with the midpoint of the
boat.
4. Apply anti-seize to bolt threads before installing nut.
5. Using the
3/8” Bolt
and
nut
, lock
Cylinder Mount Tube
into position on
Side Rail
.
You may need to adjust this position later.
6. Repeat on opposite side of the
SunLift
™
.
Forward Lug on
Cylinder Mount
Tube
SS Bolt
3/8-
16 x 3.5”
Nut SS,
Nylok 3/8-16
5.
Содержание SWIFTSHIELD A Series
Страница 5: ...FORM NO 660769 REV C PAGE 5 SwiftShield Overview Continued Lines shown disconnected...
Страница 8: ...FORM NO 660769 REV C PAGE 8 1 B Remove The contents of the Power Pack box Pump RC Unit Battery...
Страница 12: ...FORM NO 660769 REV C PAGE 12 1 F Drill Manifold Mounting Holes Location Of Mounting Holes...
Страница 13: ...FORM NO 660769 REV C PAGE 13 1 G Mounting the Pump Note Mount pump using the holes on the left...