FORM NO. 660769 REV. C
PAGE 33
2-Q
Bow Sprit Installation
Steps:
1. With boat raised, in the standard position on
SunLift™
.
2. Insert spreader pipe through hole in end of bow sprit extension tube, hold in place with
cotter pins.
3. Apply anti-seize to all bolt threads before installing nuts.
4. Position bow sprit in the center of
SunLift™
front cross beam. Clamp in place with nuts
and bolts.
5. Insert bow sprit extension tube into welded tube.
6.
Extend bow sprit to be between 0”
-
12” in front of bow, directly below roller.
7. Lock in place with 3/8-
16 x 3.5” bolt and nut.
8. Properly torque all nuts on bow sprit.
Spreader Pipe
Cross Beam
5.
Bolt SS,
3/8-
16 x 3”
2 Places
Nut SS, Nylok
3/8-16
2 Places
Bow Sprit
Extension Tube
12”
-
14”
7.
* Hydraulic hoses not shown.
Welded Tube
Содержание SWIFTSHIELD A Series
Страница 5: ...FORM NO 660769 REV C PAGE 5 SwiftShield Overview Continued Lines shown disconnected...
Страница 8: ...FORM NO 660769 REV C PAGE 8 1 B Remove The contents of the Power Pack box Pump RC Unit Battery...
Страница 12: ...FORM NO 660769 REV C PAGE 12 1 F Drill Manifold Mounting Holes Location Of Mounting Holes...
Страница 13: ...FORM NO 660769 REV C PAGE 13 1 G Mounting the Pump Note Mount pump using the holes on the left...