VI
.....................................................................................30
5.5 External Protective Grounding Connection .....................................................36
5.5.1 External Protective Grounding Requirements ........................................37
5.6.2 Requirements for OT/DT Terminal ........................................................40
5.6.3 Connection Procedure (For a multi-core cable)......................................40
5.6.4 Connection Procedure (For a single-core cable) ....................................45
5.7.2 Assembling the PV Connectors ............................................................51
5.8 Wiring of Tracking System Power Cable (optional) ..........................................53
5.9 Wireless Communication Module Connection(optional) ...................................55
5.10.1 Ethernet Communication ...................................................................56
5.10.2 WLAN Communication ......................................................................58
5.13.2 RS485 Communication System ..........................................................61
5.13.3 Connection Procedure(Terminal Block) ...............................................62
5.13.4 Connection Procedure (RJ45 Interface) ..............................................64
Содержание SG110CX-P2
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 81: ...71 End User Manual 5 Electrical Connection...
Страница 126: ...www sungrowpower com Sungrow Power Supply Co Ltd...