Chapter 2
Cabling the Expansion Cabinet
2-7
2. Screw one end of the ground strap to the power sequencer on the system cabinet
or cabinet nearest to the expansion cabinet (
FIGURE 2-5
).
FIGURE 2-5
Connecting the Ground Strap to the System Cabinet Power Sequencer
3. Screw the other end of the ground strap the front power sequencer in the
expansion cabinet (
FIGURE 2-6
).
Ground strap