2-1
C H A P T E R
2
Cabling the Expansion Cabinet
This chapter describes how to connect the power cord to the expansion cabinet
power sequencer, and how to connect the ground strap and fan-fail cable from the
expansion cabinet to the server and other cabinets.
For instructions on how to cable storage device options in the cabinet, see the
documentation that is shipped with each device.
2.1
Preparing the Expansion Cabinet
1. Verify that the key switch located at the bottom front of the expansion cabinet is
in the Standby position (
FIGURE 2-1
).
Keys for this switch are packed in the kit that was shipped with your cabinet.
FIGURE 2-1
Location of Key Switch on Bottom Front Panel
Key switch
Front trim panel