SUN EAST PEAK-350
电脑波峰焊用户手册
4 -74
Installation and Wiring
Danger
Prohibited
l
Do not put any tinder with low fire point around the wave soldering system,
otherwise it may result in fire.
l
Do not let any metal sheet drop into the machine; otherwise it may result in fire.
l
Do not install the machine in the environment of high temperature,
humidity or water; or the environment full of dirt, iron powder or
scraps.
l
Do not connect the phase and zero line, phase and grounding line, zero and
grounding line by mistake; otherwise it may result in electric shock or fire.
Instruction
l
The equipment should be used in the environment specified in this
manual. Otherwise, it may cause malfunction.
l
Do not operate the machine while the control cover is open. Otherwise it may
result in electric shock.
l
All options used must be those specified by Sun East. The use of any
other option may result in an accident.
l
The machine must be installed on the place which can support its
weight. Install the machine as per this User Manual. Otherwise, it may
result in the danger such as the collapsing.
l
Only qualified electrician can attempt to do wiring work. Otherwise, it
may result in electric shock or fire.
l
Do not connect the wires until the main body has been installed.
Otherwise, it may result in electric shock or fire.
l
Make sure the power is off while wiring or disconnecting the lines on the mail
power supply terminal, ground wire terminal and control circuit terminal.
Otherwise it may result in electric shock or fire.
l
Tighten the screws on the terminal panel. Otherwise, it may result in
fire or machine abnormal.
l
Verify that the rated voltage is equal to the voltage of AC power.
Otherwise, it may result in injury or fire.
l
Make sure
the ground terminal is grounded securely. Otherwise, it may
result in electric shock or fire.
Warning
Prohibited
The soldering system is not waterproofed. Do not place it or use it outdoor.
Mandatory
l
Install the machine firmly to avoid the personal casualty accident caused by the
installation.
l
Protect it from the sunshine.
l
Install it in the place without corrosive gas.
l
Position it in the place without quiver. Do not use it continuously in the
place of resonance point.
l
The machine should be checked thoroughly after earthquake. The
machine cannot be re-started until it is normal. Otherwise, it may result
Содержание PEAK-350
Страница 24: ...SUN EAST PEAK 350 23 74...
Страница 25: ...SUN EAST PEAK 350 24 74 2 Parameter Setup of Machine...