SUN EAST PEAK-350
电脑波峰焊用户手册
11 -74
7.
Pay special attention not to let the metal sheet, water and dunghill etc. drop into the equipment.
8.
The operator should be sure that he or she and the people around him or her are safe before
switching on or off the power supply. Only qualified personnel can operate this machine to
avoid malfunction.
9.
Install the machine firmly in order to avoid the personal casualty accident caused by installation while
the earthquake happens.
10.
Check all parts of machine and be sure there is no potential failure before switching on it, if
there occurred earthquake.
11.
Maintain or repair the machine after the solder pot and preheat system are under normal
temperature to avoid scald.
1.4.2 Operation Precaution
1.
Do not connect the terminals with the power supply whose voltage is out of range. Please
refer to 2.3 for getting the specification of power supply.
2.
The soldering system should not be on run under overload
(
preheat zone and solder pot
surpass the preset value
)
. Otherwise, it may shorten the machine life.
3.
Do the Megger experiment according to the technique stated in
“
Megger Experiment
”
.
4.
Use the creepage braker with high frequency countermeasure when the machine works under the
creepage circuit increase because of the using of transducer and other components and even the outer
creepage brake may work.
5.
UPS should be on when the equipment works. The equipment can connect with UPS automatically when
the creepage happens. Also we can conveyor the machine manually and output the components from the
oven body to avoid the damage.
(
option
)
6.
The computer cannot be used for other purposes, but only apply to this soldering system.
Do not modify or delete any data file, system file and batch file in the hard disk.
7.
Press
“
Exit
”
on Start button for ending up the operation of computer, the system will show
the message of
“
You can turn off the computer now
”
, you can turn off the power supply at
this time. Otherwise, the system will remind you some kind of dead failure.
1.4.3 Usage Precaution
1.
Install the machine firmly and reliably. Do not make it shake seriously.
2.
Install the machine at the clean place with normal humidity and temperature.
3.
The power supply should be switched off if there is no necessity to use it. Only qualified
personnel can switch on it.
Содержание PEAK-350
Страница 24: ...SUN EAST PEAK 350 23 74...
Страница 25: ...SUN EAST PEAK 350 24 74 2 Parameter Setup of Machine...