Be sure that the power supply is 3 phases, 5 wires and 380V.
(2)
Be sure that the equipment must be connected to ground.
(3)
Check if the quantity of solder can meet the needs of soldering.
(4)
Check if the content and runoff of alcohol in the clean container are proper.
(5)
Check and be sure that the proportion of flux is
0.83g/cm
3
,
and
the density is suitable.
(6)
Be sure that the air pressure falls within the scope as required.
(7)
Be sure that the stop button is flicking up and it is in good condition.
3.6 Online Test of Functions
1.
Input and Output Test. Refer to 4.4.6.
2.
Temperature Profile. Refer to 4.4.7.