22
EN/11.2018/G67C © STULZ GmbH – all rights reserved
wib8000 original instructions
Zone configuration (optional)
(Menu: Web Interface/zone)
The possibility to configure a zone in which A/C units are sequenced, has been designed in the first instance
for units which do not have a proper sequencing function or for which a sequencing can only be realized intri-
cately. (C1002, C4000, C5000, C6000). You can define 20 zones maximum.
The WIB zones 15 - 20 can be used for C7000 IOCs, which are also assigned to a C7000 IOC zone. This may
be necessary e.g. in case of DFC control and a simultaneous sequencing by the WIB.
In this window you can configure such a zone by entering a name for it and adjusting a sequencing. Setting the
sequencing you can choose among three options:
1. periodical
:
After the setting of the sequencing interval, a commutation among the units is carried out at the end of each
cycle. The remaining period to the next commutation is displayed in minutes.