100
100
Mid-height
STEP TWELVE
Figure 19
Figure 20
STEP THIRTEEN
Figure 22
Figure 23
Figure 21
Trim with
tin snips
if required
Before installing any of the mullion flashings refer to the roller door
instruction manual, the roller door brackets require installation
before completing this step. Install the mullion flashings to the
mullions, ensure the flashing is flush against the 55mm top channel
(Figure 19). Using rivets attach the flashing to the mullion 100mm
from the top and bottom and mid-height, both sides (Figure 20).
Using three rivets install the infill bracket to the mullion, mullion
flashing should be attached (Figure 21). Repeat for all infill brackets
as per shed requirements. Place the infill flashing between the
mullions to determine if any trimming is necessary, if so use tin
snips to evenly trim both ends of the flashing (Figure 22). Use
eight rivets to secure the infill flashing in position. Using three
rivets secure each end to the infill brackets, then evenly space the
remaining two rivets fixing to the 55mm top channel (Figure 23).