25
866-795-1586 • WWW.STONEAGETOOLS.COM
PROPOSITIONER ATTACHMENT TO DOMED BUNDLE
FIGURE 38
SET THE DRIVE RAIL AND LINEAR DRIVE IN PLACE
23. Before locking the Positioner in place, be sure that the Guide
Tube can swing in the direction shown below without hitting the
walls and the Linear Drive has enough stroke to reach the Top
Tube.
(Figure 38)
24. Once it has been determined that the Linear Drive has enough
stroke and the Guide Tube will not hit the wall during operation,
lock down the following;
•
Linear Drive Gear Engagement Handles
•
Rotary Drive Rail Clamp
•
Rotary Drive Quick Release Pin
(Figure 39)
TOP TUBE
Compare the set-up of the Positioner against the diagrams in the
next two pages for proper orientation before installing air hoses
from the Control Box.
Rotary Drive Quick
Release Pin
Linear Drive Gear
Engagement Handles
Rotary Drive
Rail Clamp
FIGURE 39
Содержание PROPOSITIONER PROP-DBP
Страница 1: ...PL 688 REV D 08 2020 PROPOSITIONER PROP DBP ACCESSORY USER MANUAL...
Страница 7: ...7 866 795 1586 WWW STONEAGETOOLS COM NOTES PAGE LEFT BLANK INTENTIONALLY...
Страница 51: ...51 866 795 1586 WWW STONEAGETOOLS COM PAGE LEFT BLANK INTENTIONALLY NOTES...
Страница 52: ...52 866 795 1586 WWW STONEAGETOOLS COM PAGE LEFT BLANK INTENTIONALLY NOTES...
Страница 53: ...53 866 795 1586 WWW STONEAGETOOLS COM PAGE LEFT BLANK INTENTIONALLY NOTES...
Страница 56: ...1 866 795 1586 www STONEAGETOOLS com 2020 StoneAge Inc All Rights Reserved...